January 12-February 22, 2021 Operations Report

Kevin Southworth, Operations Manager

During this period:

  • Completed Water Facilities Inventory (WFI) and analysis.

  • One of the turbidimeters failed and a new turbidimeter is on order.

  • Raw turbidity has decreased allowing the treatment plant to filter at a faster rate with less

    coagulants. No turbidity violation is expected in February.

  • Wilson Engineering has initiated the System Capacity Analysis as part of the

    requirements for permitting a new water treatment plant. Staff is collecting a 5-year

    history of usage records for this analysis.

Coming up:

  • Isaac is scheduled to take the Cross Connection Connection Specialist exam on March

    15, 2021. Dave Olson will begin CCC consultation in March.

January 2021 Water Usage (in gallons)

From storage tanks 519,900 Chlorine monitoring feed (0.178 gpm) 7,950
Net to distribution  511,950
Flushing 3,650 Residential meters    263,800
Unaccounted for water 244,500 Percentage of loss        48.1%