June 22-July 12, 2021 Operations Report

Kevin Southworth, Operations Manager

During this period:

  • Our major on-going leak has finally been identified on Mt. Vista Drive after extensive

    investigation since the beginning of June. Dave Olsen with Water System Services

    helped locate the general area with an amplified geophone on July 8. We hope to

    excavate the water main as soon as utilities are located this week.

  • The treatment plant continues to produce excellent water with low turbidity levels.

  • Clubhouse water service replacement is complete and Clubhouse will be available for

    member use this week.

  • Pump-back pump replaced June 25 by PMG Controls. New pump automatically

    starts/stops based on level in the well, instead of a manual switch

  • The small dock retaining ring broke in an overnight windstorm on June 30 and was

    replaced by Chris Immer, who also fabricated another reserve ring. Chris also installed a

    new anchor rope on the end of the small docks on July 3.

Coming up:

  • Opening the Clubhouse

  • Installation of new finished water turbidimeter

June 2021 Water Usage (in gallons)

From storage tanks 1,095,400 Chlorine monitoring feed (0.178 gpm) 7,950
Net to distribution  1,087,450
Flushing 0 Residential meters    403,110
Unaccounted for water 684,340 Percentage of loss        62.9%