September 6-October 24, 2021 Operations Report

Kevin Southworth, Operations Manager

During this period:

  • The small docks broke free on September 17. The docks were secured to a mooring buoy that day during stormy conditions and were moved to drydock on September 18 with the help of members Nick Kluge and Guy Brooks.

  • Large docks were removed on October 11. The dock system was damaged at multiple locations due to the September 17 event.

  • The water treatment main pump relay was replaced on October 15 by PMG Controls.

  • The pressure reducing valve near 3058 Hales Passage was replaced by RAM Construction on October 18, while Kevin and Isaac replaced a leaking blow-off valve at 1221 Scenic Ave.

Coming up:

  • The Operations Shop metal door and frame will arrive soon and be installed as soon as possible.

September 2021 Water Usage (in gallons)

From storage tanks 417,800 Chlorine monitoring feed (0.178 gpm) 7,950
Net to distribution  409,850
Flushing 3,400 Residential meters    305,520
Unaccounted for water 100,930 Percentage of loss        24.8%