August 20-September 16, 2022 Operations Report

Kevin Southworth, Operations Manager

During this period:

  • Flushed sections 1 and 4

  • Dam Annual Inspection Report filed and accepted by DOE

  • Reserve Study on-site consultation

  • New P.T. Ops Staff employee, Justin Swaen, started

  • Monthly meeting with DOH

  • Brush removal from dam and various locations

August 2022 Water Usage (in gallons)

From storage tanks 614,100 Chlorine monitoring feed (0.178 gpm) 7,950
Net to distribution 606,150
Flushing 3,000 Residential meters 426,136
Unaccounted for water 177,014 Percentage of loss 29% Average gallon per minute loss 4.0

Lab results from this period:

Location: SP1, S01 Date: 09/06/22

Total Coliform: Satisfactory E. Coil: Absent

Location: Dickinson Lake STA 1 2 FT Date: 09/06/22

Chlorophyll A: 4.85 ug/L

Pheophytin A: 0.485 ug/L

Location: Dickinson Lake STA 1 10 FT Date: 09/06/22

Chlorophyll A:3.49 ug/L

Pheophytin A:0.786 ug/L

Location: Dickinson Lake STA 1 12 FT Date: 09/06/22

Chlorophyll A:5.07 ug/L

Pheophytin A: 0.485 ug/L