June 24-July 28, 2023 Operations Report

Kevin Southworth, Operations Manager

During this period:

  • CCR, WUE reports submitted

  • Replaced failed PRV and meter at the marina

  • Communicating w/ DOH specialist and WDFW biologist regarding pond weed mitigation

  • Flushing section 3

  • Gathering bids for reservoir floating dock and gangway

  • Mowed right of ways and weed eating various locations

  • Boat ramp repair

  • Located a leak at a service connection (~¾ GPM). Replaced a 30 foot section of old service piping and installed a new meter on the customer side of the road.

  • SDS updated

  • Integrated 2nd stream analysis on the UV254 for greater WTP performance monitoring

Upcoming Projects:

  • Establish new WUE Goals and provide membership w/ public forum for discussion

  • Reservoir floating dock bids review

  • Continue leak detection and distribution repairs

  • Repair Cabana bathrooms

  • Electrician to correct the wiring in the Clubhouse and various WTP projects (pending availability)

June 2023 Water Usage (in gallons)

From storage tanks 487,600 Chlorine monitoring feed (0.178 gpm) 7,690
Net to distribution 479,910
Flushing 3,000 Residential meters 348,390
Unaccounted for water 128,520 Percentage of loss 27% (~10% reduction from May) Average gallon per minute loss 3.0

Water Bacteriological Analysis

Date Location Total Coliform E. Coli Fecal Coliform

07/05/23 SP2, SO1 Satisfactory Absent N/A