December 16, 2023-January 18, 2024 Operations Report

Kevin Southworth, Operations Manager

During this period:

  • Troubleshooting filter performance issues

  • DoH onsite visit (site review, troubleshooting assistance, jar testing)

  • New filter media profile design R & D

  • Backwash cycle calculation and procedure optimization

  • Jar testing (ferric, pac, poly)

  • CL-10, pH, 2100Q, TU5300, 1720e calibration

  • Portable UVT purchased

  • Filter media inspection w/ core samples gathered and analyzed

  • Leakage surveying

  • Responded to customer calls regarding broken water lines

  • Dam EAP final submitted to DoE

  • Pressure washed Clubhouse steps and cleaned parking area

  • Street sweeping

  • Flushing

  • Weekly and monthly dam inspections

  • Cleaned gutters on Cabana

  • Replaced 6 meter heads

  • Winterized Clubhouse, Cabana, and distribution components

  • Routine maintenance performed on the generator and LISECC work truck

Upcoming Projects:

  • Filter media replacement (January-February 2024)

  • Rebuild raw water feed to include a new static mixer, check valve, and flow meter (January-February 2024)

  • Reservoir floating dock (unknown)

  • Repair leak inside PRV vault (January-February 2024)

  • Install 2 new stations (April-May 2024)

  • Clubhouse lighting (Pending availability of the electrician)

  • Install Marina cameras (January-February 2024)

  • Continue leak detection and distribution repairs (Ongoing)

  • Repair Cabana bathrooms (February-March 2024)

  • New WTP review w/ Wilson Engineering (Ongoing)

  • Pondweed removal w/ Northwest Aquatic Management (February 2024)

  • Reservoir cleaning w/ Liquivision Technology (Summer, 2024)

    December 2023 Water Usage (in gallons)

Total Water Produced 390,100 Chlorine monitoring (0.178 gpm) 7,946
Flushing 3,000
Metered Usage 233,400
Other (Chlorine residual testing, BW) 2,325 Authorized Consumption 246,671
System Leakage 143,429
Percentage of loss 36.8% Average gallon per minute loss 3.2