September 27-October 18, 2024 Operations Report
/Nick Kluge, Operations Manager
During this period:
● Lead Service Line Inventory submitted
● Weekly customer leakage survey
● Calibration and verifications of online and portable analyzers
● Cleaned and serviced chemical feed pumps, injection quills, and solution day tanks
● Cycled water treatment flow pump
● Monthly, bi-monthly dam inspections
● Monthly distribution system flushing
● Daily groundskeeping various locations
● Street sweeping various locations
● Ram Construction site visit for WTP floor beam inspection
● Scheduled the LISECC work truck for tire, breaks and alignment service
● Received new signage for Holiday Lake
● Cleaned Clubhouse
● Removed illegal gate
● Northwest Technologies on-site onboarding visit
● Coordinating reservoir dock project with Kingworks Engineering
● Water treatment coagulation performance analysis
Upcoming Projects:
● Marina dock removal
● Winterize the Clubhouse
● Relocate a customers water service connection
● Optimize coagulation and filtration process
● Continue leak detection and distribution repairs
● New WTP review w/ Wilson Engineering
● Repair Cabana bathrooms
● Install fish cages in the lakes
● Install Marina cameras
● Install new distribution sampling stations
● Replace old standpipe valves
● Reservoir floating dock
● Filter media replacement
September 2024 Water Production/Usage (in gallons)
Total Water Produced 388,800 Chlorine monitoring (0.178 gpm) 7,690
Flushing 3,000
Metered Usage 281,750
Other (Chlorine residual testing, BW) 2,250 Authorized Consumption 294,690
System Leakage 94,110
Percentage of loss 24.2% Average gallon per minute loss 2.2