January 24, 2026-February 20, 2026 Operations Report
/Nick Kluge, Operations Manager
During this period:
New part time grounds maintenance position filled, welcome Andy!
LISECC Truck maintenance
SWSMP document drafting (Source Water Protection, ERP, O&M, WQMP, Inventory, WUE)
Troubleshooting and investigating filter performance and efficiency
WTP maintenance (meters, injector pumps)
Jar testing (Optimizing doses and testing other coagulants)
Installed new water deionization filter for WTP lab
Installed new WTP filter performance monitoring gauges
Ordered new valves and supplies for WTP
Continued maintenance on sweeper
Groundskeeping and cleared roads of windfall
Stormdrains inspected and cleared of debris
Pressure washer maintenance
Distribution components inspections
Monthly/bi-monthly/and annual dam inspections and reporting
DOE discharge monitoring tests
Monthly distribution system flushing
Water samples submitted for DOH monthly quality compliance
Cleaned and serviced online analyzers
Weekly customer leakage survey
Monthly DOH meeting
Tested the WTP generator
Upcoming Projects:
➢ Replace catalytic converters on LISE work truck
➢ Decommission old raw water line under the dam
➢ Install new fish cleaning station on marina dock
➢ Replace sampling stations on Cedar Ave, and at the Island/Beach intersection
➢ Replace bent standpipe on Island Dr
➢ PRV vault replacement (seeking bids)
➢ Community road repairs (seeking bids)
➢ Install fish cages in the lakes
➢ Refurbish the Cabana bathrooms
➢ Install Marina cameras
➢ Replace old standpipe valves
➢ Reservoir floating dock
January 2026 Water Production/Usage (in gallons)
Total Water Produced 348,100 Chlorine monitoring (0.178 gpm) 7,946
Flushing 3,000
Metered Usage 228,190
Other (Chlorine residual testing, BW) 2,325 Authorized Consumption 241,761
System Leakage 106,639
Percentage of loss 30.63% Average gallon per minute loss 2.39