August 2018 Operations Report

Kevin Southworth, Operations Manager

During this month we:

  • Repaired major leak on a 4-inch main above the Marina parking lot, completed on August 16. During excavation, the pipe was severed with approximately 5,000 gallons lost during the repair.

  • Received new lawn tractor on August 9 and road sweeper attachment on August 30.

  • PMG Controls began work on electronics installation for remote monitoring (SCADA) system.

  • Received emergency preparedness supplies to be stored at Maintenance Shop.

  • Repair shower head in Cabana women’s bathroom.

The Fire Marshall inspected the Clubhouse on August 29 with a list of compliance items that we are currently working on.

Water Usage (in gallons)

Pumped    792,660
Backwashes    49,500
Net pumped    743,160
Flushing    5,000
Net to distribution    738,160
Loss from leak repair, estimated 5,000 Residential meters    426,600
Unaccounted for water    306,560
Percentage of loss        42%