October 24-November 18, 2022 Operations Report

Kevin Southworth, Operations Manager

During this period:

  • Flushed section 3

  • Surveying at Clubhouse

  • Propane leak detected at Clubhouse and has been repaired

  • Repaired the PRV on the hot water heater at Clubhouse

  • Cleared drainage ditches of debris around Clubhouse

  • Repaired leaking standpipe at Aiston Creek Bridge, estimated loss recovered ~ 2 gpm

  • Street sweeping various locations including the Clubhouse and Berry Way

  • Repaired Fire Dept. standpipe at Swim Lake

  • Distribution leakage localized to within the North loop of the system

Upcoming Projects:

  • Locate and repair distribution leakage in North loop

  • Seal/repair roof leak at the Clubhouse

  • Repair the standpipe at 1108 Island Dr. for potential loss recovery ~ 1-2 gpm

October 2022 Water Usage (in gallons)

From storage tanks 536,500 Chlorine monitoring feed (0.178 gpm) 8,203
Net to distribution 528,297
Flushing 3,000 Residential meters 300,140
Unaccounted for water 225,157 Percentage of loss 42.9% Average gallon per minute loss 4.9

Lab Results from this Period (PDF)