November 19-December 15, 2022 Operations Report

Kevin Southworth, Operations Manager

During this period:

  • Flushed section 4

  • Various leaks detected and fixed, recovered ~ 8gpm

  • Repaired docks water line

  • Street sweeping and grounds maintenance

  • Rebuilt raw water sampling manifold in WTP

  • Repaired frozen reservoir pump back system

Upcoming Projects:

  • Leak detecting and distribution repairs

  • Weir design and construction at the reservoir

November 2022 Water Usage (in gallons)

From storage tanks 471,100 Chlorine monitoring feed (0.178 gpm) 7,945
Net to distribution 463,155
Flushing 3,000 Residential meters 230,060
Unaccounted for water 230,095 Percentage of loss 50.0% Average gallon per minute loss 5.3

Lab Results from this Period (PDF)