January 20-February 20, 2023 Operations Report

Kevin Southworth, Operations Manager

During this period:

★ Repaired ruptured PRV at swim lake

★ Flushed section 2

★ Marked locations for the dog waste bag posts

★ Meetings with contractors at Clubhouse

★ Cleared access to new WTP site for geotech study

Upcoming Projects:

● Leak detecting and distribution repairs

● New service connection on Scenic Ave

● Geotech review for new WTP

● Reservoir sampling station gangway design

January 2023 Water Usage (in gallons)

From storage tanks 555,600 Chlorine monitoring feed (0.178 gpm) 7,946
Net to distribution 547,654
Flushing 3,000 Residential meters 224,580
Unaccounted for water 320,074 Percentage of loss 59% Average gallon per minute loss 7.2

Lab Results from this Period (PDF)