April 27-May 17, 2025 Operations Report

Nick Kluge, Operations Manager

During this period:

● Grounds keeping

● Troubleshooting filter performance problem

● Reviewed engineering drawings from Kingworks for reservoir dock

● WTP Maintenance

● NW Tech site visit

● Cleaned boat ramp

● Preventative Maintenance Plan

● Clubhouse maintenance

● Brush removal (Scotch Broom)

● Replaced marina docks anodes

● Mowing and weed trimming various locations

● PM for mower

● Monthly and bi-monthly dam inspections

● Weekly DOE discharge monitoring tests

● Monthly distribution system flushing

● Collected water samples for lab analysis for DOH monthly quality compliance

● Cleaned and serviced online analyzers

● Weekly customer leakage survey

● Monthly DOH meeting

● Received progress report and engineering drawings from Kingworks for review

● Tested the WTP generator

● Continued cleaning and organizing of the maintenance shop and mower shed

● Picked up treatment chemicals from town

● Received marina dock pontoons and new frame and staged for assembly at boat ramp

Upcoming Projects:

● Complete repairs and pre-launch inspection of marina docks

● Collect bids for community road repairs

● Relocate a customers water service connection

● Locate and confirm condition of the decommissioned old raw supply pipe

● Repair failing wires on reservoir tank level sensors

● Repair Cabana bathrooms

● Install fish cages in the lakes

● Install Marina cameras

● Install new distribution sampling stations

● Replace old standpipe valves

● Reservoir floating dock engineering drawings review and permit application

April 2025 Water Production/Usage (in gallons)

Total Water Produced 343,600 Chlorine monitoring (0.178 gpm) 7,690
Flushing 3,000
Metered Usage 228,120
Other (Chlorine residual testing, BW) 2,250 Authorized Consumption 241,060
System Leakage 102,540
Percentage of loss 29.8% Average gallon per minute loss 2.4