May 18-June 22, 2025 Operations Report
/Nick Kluge, Operations Manager
During this period:
● Grounds keeping
● Troubleshooting filter performance problem
● WTP Maintenance
● NW Tech site visit for network upgrades
● Coordinated site visit times for private road inspections
● CCR and WUE Report drafting
● Preventative Maintenance Plan
● Clubhouse maintenance and cleaning
● Installed occupied/vacant locks on cabana bathroom doors
● Monthly and bi-monthly dam inspections
● Weekly DOE discharge monitoring tests
● Monthly distribution system flushing
● Collected water samples for lab analysis for DOH monthly quality compliance
● Cleaned and serviced online analyzers
● Weekly customer leakage survey
● Monthly DOH meeting
● Received progress report and engineering drawings from Kingworks for review
● Tested the WTP generator
● Continued cleaning and organizing of the maintenance shop and mower shed
● Picked up treatment chemicals from town
● Picked up UHMW for docks
● Finishing touches to docks to prepare for launch
Upcoming Projects:
● Launch marina docks
● Collect bids for community road repairs
● Send out CCR and WUE Report
● Locate and confirm condition of the decommissioned old raw supply pipe
● Repair failing wires on reservoir tank level sensors
● Repair Cabana bathrooms
● Install fish cages in the lakes
● Install Marina cameras
● Install new distribution sampling stations
● Replace old standpipe valves
● Reservoir floating dock engineering drawings review and permit application
May 2025 Water Production/Usage (in gallons)
Total Water Produced 398,900 Chlorine monitoring (0.178 gpm) 7,946
Flushing 3,000
Metered Usage 279,950
Other (Chlorine residual testing, BW) 2,325 Authorized Consumption 293,221
System Leakage 105,679
Percentage of loss 26.5% Average gallon per minute loss 2.4