June 22-July 18, 2025 Operations Report

Nick Kluge, Operations Manager

During this period:

● All docks deployed

● Delivered CCR’s and WUE reports

● Grounds keeping

● Continue progress on water adjudication process

● WTP Maintenance

● Located and repaired a leak in the swim lake PRV vault

● Private road site visit with WRS

● Relocated customer water service connection

● Investigation and troubleshooting of a low pressure zone

● Clubhouse maintenance and cleaning

● Kevin covered 2 days for staff

● Beach Ave washout reconstruction started

● Monthly and bi-monthly dam inspections

● Weekly DOE discharge monitoring tests

● Monthly distribution system flushing

● Collected water samples for lab analysis for DOH monthly quality compliance

● Cleaned and serviced online analyzers

● Weekly customer leakage survey

● Monthly DOH meeting

● Marina cleanup

● Tested the WTP generator

● Continued cleaning and organizing of the maintenance shop and mower shed

● Town supply runs and junk removal

● Repairs to dock pilings

Upcoming Projects:

● Locate and confirm condition of the decommissioned old raw supply pipe

● Distribution refurbishment on Dogwood for low water pressure

● Investigate water leak under Beach Ave. at the Beach/Cedar intersection

● Collect additional bids for community road repairs

● Install fish cages in the lakes

● Repair failing wires on reservoir tank level sensors

● Repair Cabana bathrooms

● Install Marina cameras

● Install new distribution sampling stations

● Replace old standpipe valves

● Reservoir floating dock engineering drawings review and permit application

June 2025 Water Production/Usage (in gallons)

Total Water Produced 466,000 Chlorine monitoring (0.178 gpm) 7,690
Flushing 3,000
Metered Usage 341,210
Other (Chlorine residual testing, BW) 2,250 Authorized Consumption 354,450
System Leakage 111,550
Percentage of loss 23.9% Average gallon per minute loss 2.6