October 26-November 21, 2025 Operations Report
/Nick Kluge, Operations Manager
During this period:
● SWSMP review and drafting
● Attended disaster response and evacuation plan meeting
● Reviewed FireWise program for the new 3 year plan
● Lowering Swim Lake level for the season
● Inspected and cleaned drainage ditches and culverts
● Identified and repaired another service main leak
● Planning and preparation for the relocation of a failing service main
● Repaired broken park bench at the Swim Lake
● Installed new water service connection
● Jar testing
● Troubleshooting poor filter performance
● PM’s on mower
● Inspected vaults and PRVs
● Grounds keeping (clearing ditches, street sweeping)
● Monthly and bi-monthly dam inspections
● DOE discharge monitoring tests
● Monthly distribution system flushing
● Water samples for DOH monthly quality compliance
● Cleaned and serviced online analyzers
● Weekly customer leakage survey
● Monthly DOH meeting
● Tested the WTP generator
● Scheduling the site visit with Ram for the old raw water line project
Upcoming Projects:
● Winterize Clubhouse. Water turned off (December 1ˢᵗ-March 1ˢᵗ)
● Update SWSMP
● Install new fish cleaning station on marina dock
● Replace sampling stations on Cedar Ave, and at the Island/Beach intersection
● Replace bent standpipe on Island Dr
● PRV vault replacement (seeking bids)
● Community road repairs (seeking bids)
● Install fish cages in the lakes
● Refurbish the Cabana bathrooms
● Install Marina cameras
● Replace old standpipe valves
● Reservoir floating dock
October 2025 Water Production/Usage (in gallons)
Total Water Produced 353,400 Chlorine monitoring (0.178 gpm) 7,946
Flushing 3,000
Metered Usage 231,520
Other (Chlorine residual testing, BW) 2,325 Authorized Consumption 244,791
System Leakage 108,609
Percentage of loss 30.7% Average gallon per minute loss 2.4