October 18-November 21, 2026 Operations Report

Nick Kluge, Operations Manager

During this period:

  • Meter head replacements

  • SWSMP review with Wilson

  • Identified and repaired service connection leak

  • AGM

  • Distributed boat citations at Clubhouse

  • Work truck maintenance

  • Cabana bathroom refurbishment

  • Lowered Holiday Lake to winter level

  • Windfall debris cleanup

  • Staff meeting

  • All gutters and downspouts cleared

  • Holiday Lake grounds keeping

  • Storm drains inspected and cleared of debris

  • Scheduled annual furnace service for the Clubhouse

  • Winterized Water Treatment Plant

  • Tree removal from Clubhouse

  • Developed a chainsaw training and operations program

  • Marina camera install

  • Monthly/bi-monthly/and annual dam inspections and reporting

  • DOE discharge monitoring tests

  • Monthly distribution system flushing

  • Water samples submitted for DOH monthly quality compliance

  • Cleaned and serviced online analyzers

  • Weekly customer leakage survey

  • Tested the WTP generator

Upcoming Projects:

➢ Reduce distribution losses
➢ Replace sampling stations on Cedar Ave, and at the Island/Beach intersection
➢ Replace standpipes and valves (Baker, Beach, Island, Marina)
➢ PRV vault replacement
➢ Install fish cages in the lakes
➢ Install Marina cameras
➢ Replace old standpipe valves
➢ Reservoir floating dock

October 2026 Water Production and Usage (in gallons)

Total Water Produced 521,900 Chlorine monitoring (0.178 gpm) 7,946
Flushing 3,000
Metered Usage 209,370
Other (Chlorine residual testing, BW) 2,325 Authorized Consumption 222,641
System Leakage 299,259
Percentage of loss 57.34% Average gallon per minute loss 6.70