October 18-November 21, 2026 Operations Report
/Nick Kluge, Operations Manager
During this period:
Meter head replacements
SWSMP review with Wilson
Identified and repaired service connection leak
AGM
Distributed boat citations at Clubhouse
Work truck maintenance
Cabana bathroom refurbishment
Lowered Holiday Lake to winter level
Windfall debris cleanup
Staff meeting
All gutters and downspouts cleared
Holiday Lake grounds keeping
Storm drains inspected and cleared of debris
Scheduled annual furnace service for the Clubhouse
Winterized Water Treatment Plant
Tree removal from Clubhouse
Developed a chainsaw training and operations program
Marina camera install
Monthly/bi-monthly/and annual dam inspections and reporting
DOE discharge monitoring tests
Monthly distribution system flushing
Water samples submitted for DOH monthly quality compliance
Cleaned and serviced online analyzers
Weekly customer leakage survey
Tested the WTP generator
Upcoming Projects:
➢ Reduce distribution losses
➢ Replace sampling stations on Cedar Ave, and at the Island/Beach intersection
➢ Replace standpipes and valves (Baker, Beach, Island, Marina)
➢ PRV vault replacement
➢ Install fish cages in the lakes
➢ Install Marina cameras
➢ Replace old standpipe valves
➢ Reservoir floating dock
October 2026 Water Production and Usage (in gallons)
Total Water Produced 521,900 Chlorine monitoring (0.178 gpm) 7,946
Flushing 3,000
Metered Usage 209,370
Other (Chlorine residual testing, BW) 2,325 Authorized Consumption 222,641
System Leakage 299,259
Percentage of loss 57.34% Average gallon per minute loss 6.70