March 2017 Operations Report

Operations report for March 2017

 

Water Usage

Pumped                                   377,920      

Backwashes                             51,150                      

Net pumped                            326,770                                                                                                                                     

The docks will be deployed Monday, May 1 and Tuesday, May 2 due to tidal conditions. The boat ramp will not be available to members on those days.

Chart recorder for the CL17 failed. New chart recorder is $1000 plus shipping and handling.

Isaac set to take his exams at the end of the month. As Department of Health requires a shift position to have 12 months experience, LISECC will need to inform DOH that we intend to apply for a waiver before John retires.

Kevin is scheduled to take the Cross Connection Control test at the end of the month.

Kevin's telephone is dying, he will need a new basic flip phone.