August 16-September 26, 2025 Operations Report
/Nick Kluge, Operations Manager
During this period:
● Removed marina docks
● DOE Site visit and inspection
● Pressure zone surveying and data analysis
● Inspected new flushing station installed by Granite Construction at Beach Ave
● PM’s completed on backhoe
● Replaced WTP filter head gauge
● Policy drafting for Water Pressure Adequacy
● Repaired a damaged service connection on Beach Ave
● Meetings at Clubhouse for deck replacement bids
● Clubhouse maintenance, cleaning and inspection
● O&M manual updates
● Cleaned boat ramp
● Cleaned gutters at Clubhouse
● Grounds keeping (mowing, weed eating, clearing ditches)
● Monthly and bi-monthly dam inspections
● Weekly DOE discharge monitoring tests
● Monthly distribution system flushing
● Water samples for DOH monthly quality compliance
● Cleaned and serviced online analyzers
● Weekly customer leakage survey
● Monthly DOH meeting
● Tested the WTP generator
● Ongoing discussions with Ram regarding the decommissioning of the old raw water line
Upcoming Projects:
● Thursday, October 2nd - Pond Weed Removal
● Friday, October 3rd - Install signage around Swim Lake
● Install new fish cleaning station on marina dock
● Replace sampling stations on Cedar Ave, and at the Island/Beach intersection
● Replace bent standpipe on Island Dr
● PRV vault replacement (seeking bids)
● Community road repairs (seeking bids)
● Install fish cages in the lakes
● Refurbish the Cabana bathrooms
● Install Marina cameras
● Replace old standpipe valves
● Reservoir floating dock
August 2025 Water Production/Usage (in gallons)
Total Water Produced 480,800 Chlorine monitoring (0.178 gpm) 7,946
Flushing 3,000
Metered Usage 379,530
Other (Chlorine residual testing, BW) 2,325 Authorized Consumption 392,801
System Leakage 87,999
Percentage of loss 18.3% Average gallon per minute loss 2.0