February 21-March 20, 2026 Operations Report
/Nick Kluge, Operations Manager
During this period:
Swim lake sign installed
SWSMP document drafting (ERP, O&M, WQMP, Inventory, WUE)
Troubleshooting and investigating filter performance and efficiency
WTP maintenance (meters, injector pumps)
Jar testing (Optimizing doses and testing other coagulants)
LISECC Truck PMs
Refinished picnic tables
Replaced 8 customer meter heads
Started sourcing a replacement sweeper
Called out Highlander pump to replace pump controller
Removed playground fence (damaged in storm)
Cabana remodel underway
Scheduled RAM Construction site visit for decommissioning old service line
Scheduled Huizenga for road repair site visit
Stormdrains inspected and cleared of debris
Pressure washer maintenance
Distribution components inspections
Monthly/bi-monthly/and annual dam inspections and reporting
DOE discharge monitoring tests
Monthly distribution system flushing
Water samples submitted for DOH monthly quality compliance
Cleaned and serviced online analyzers
Weekly customer leakage survey
Monthly DOH meeting
Tested the WTP generator
Upcoming Projects:
➢ Decommission old raw water line under the dam
➢ Install new fish cleaning station on marina dock
➢ Replace sampling stations on Cedar Ave, and at the Island/Beach intersection
➢ Replace bent standpipe on Island Dr
➢ PRV vault replacement (seeking bids)
➢ Install fish cages in the lakes
➢ Install Marina cameras
➢ Replace old standpipe valves
➢ Reservoir floating dock
February 2026 Water Production and Usage (in gallons)
Total Water Produced 348,100 Chlorine monitoring (0.178 gpm) 7,946
Flushing 3,000
Metered Usage 228,190
Other (Chlorine residual testing, BW) 2,325 Authorized Consumption 241,461
System Leakage 106,639
Percentage of loss 30.63% Average gallon per minute loss 2.39