March 21-April 22, 2026 Operations Report
/Nick Kluge, Operations Manager
During this period:
Carol Lane lake sign installed
SWSMP document drafting
Troubleshooting and investigating fi lter performance and effi ciency
Research treatment techniques
Backhoe preventative maintenance
Mowing and grounds maintenance
Preparing docks for launch
Boat launch ramp maintenance
Replace broken swim lake park bench
Removed failed mixing pump from reservoir tank #2
Cabana remodel underway
Raw water line decommissioning site visit and planning
Huizenga conversations on road repairs
Stormdrains inspected and cleared of debris
Mower maintenance performed
Distribution components inspections
Monthly/bi-monthly/and annual dam inspections and reporting
DOE discharge monitoring tests
Monthly distribution system flushing
Water samples submitted for DOH monthly quality compliance
Cleaned and serviced online analyzers
Weekly customer leakage survey
Tested the WTP generator
Upcoming Projects:
➢ Replace mixing pump in Tank #2
➢ Decommission old raw water line under the dam
➢ Launch docks (end of April-first week of May)
➢ Replace sampling stations on Cedar Ave, and at the Island/Beach intersection
➢ Replace bent standpipe on Island Dr
➢ PRV vault replacement (seeking bids)
➢ Install fish cages in the lakes
➢ Install Marina cameras
➢ Replace old standpipe valves
➢ Reservoir floating dock
March 2026 Water Production and Usage (in gallons)
Total Water Produced 383,000 Chlorine monitoring (0.178 gpm) 7,946
Flushing 3,000
Metered Usage 217,916
Other (Chlorine residual testing, BW) 2,325 Authorized Consumption 231,187
System Leakage 151,813
Percentage of loss 39.64% Average gallon per minute loss 3.40