April 23-May 31, 2026 Operations Report

Nick Kluge, Operations Manager

During this period:

  • DOE raw water line meeting

  • SWSMP & Ops Manual editing

  • Troubleshooting and investigating filter performance and efficiency

  • Boat launch ramp maintenance

  • Launched docks

  • Installed flushing adaptor for Beach Ave

  • Distribution components inspections

  • Backhoe preventative maintenance

  • Received order of gravel

  • Ordered new mixing pump for reservoir tank #2

  • Installed bird & bat houses at swim lake

  • Received second estimate for road repairs

  • Mowing and grounds maintenance

  • Stormdrains inspected and cleared of debris

  • Grounds keeping tool maintenance performed

  • Monthly/bi-monthly/and annual dam inspections and reporting

  • DOE discharge monitoring tests

  • Monthly distribution system flushing

  • Water samples submitted for DOH monthly quality compliance

  • Cleaned and serviced online analyzers

  • Weekly customer leakage survey

  • Tested the WTP generator

Upcoming Projects:

➢ Road repair patch and seal
➢ Replace mixing pump in Tank #2
➢ Decommission old raw water line under the dam
➢ Replace sampling stations on Cedar Ave, and at the Island/Beach intersection
➢ Replace bent standpipe on Island Dr
➢ PRV vault replacement (seeking bids)
➢ Install fish cages in the lakes
➢ Install Marina cameras
➢ Replace old standpipe valves
➢ Reservoir floating dock

April 2026 Water Production and Usage (in gallons)

Total Water Produced 348,800 Chlorine monitoring (0.178 gpm) 7,690
Flushing 3,000
Metered Usage 242,800
Other (Chlorine residual testing, BW) 2,250 Authorized Consumption 255,740
System Leakage 93,060
Percentage of loss 26.7% Average gallon per minute loss 2.15