June 1-June 19, 2026 Operations Report
/Nick Kluge, Operations Manager
During this period:
Prep work for DOH Sanitary Survey
Filter inspection and performance optimization
Ops Manual final
Pump back system adjustment for summer season
Pond weed removal
Replaced Tank #2 PAX mixer pump
New OIT plant ops intro
Cleaned Cabana gutters and repair downspout
Turned on Cabana HTH and shower
Asphalt patch job 3 locations
CCR and WUE drafting Replaced batteries in smoke detectors at Clubhouse
Marina dock maintenance
Installed new office light in General Manager’s office
CUPPS asset inventory
Mowing and grounds maintenance
Stormdrains inspected and cleared of debris
Grounds keeping tool maintenance performed
Monthly/bi-monthly/and annual dam inspections and reporting
DOE discharge monitoring tests
Monthly distribution system flushing
Water samples submitted for DOH monthly quality compliance
Cleaned and serviced online analyzers
Weekly customer leakage survey
Tested the WTP generator
Upcoming Projects:
➢ Replace sampling stations on Cedar Ave, and at the Island/Beach intersection
➢ Replace bent standpipe on Island Dr
➢ PRV vault replacement
➢ Install fish cages in the lakes
➢ Install Marina cameras
➢ Replace old standpipe valves
➢ Reservoir floating dock
May 2026 Water Production and Usage (in gallons)
Total Water Produced 390,000 Chlorine monitoring (0.178 gpm) 7,946
Flushing 3,000
Metered Usage 272,340
Other (Chlorine residual testing, BW) 2,325 Authorized Consumption 285,611
System Leakage 104,389
Percentage of loss 26.8% Average gallon per minute loss 2.34