June 20-July 23, 2026 Operations Report

Nick Kluge, Operations Manager

During this period:

  • Dam O&M and EAP revisions

  • Connected fish cleaning station to water

  • Replaced marina hose

  • DOH Sanitary Survey

  • CCR and WUE delivered

  • Reviewed new residence construction plan

  • Replaced monitoring sensors

  • Replaced starter on LISECC Truck

  • Backhoe PM’s

  • Gutters and downspouts cleared

  • Filter maintenance

  • Holiday Lake grounds keeping

  • Drainage ditches cleared

  • CUPPS asset inventory

  • Mowing and grounds maintenance

  • Storm drains inspected and cleared of debris

  • Grounds keeping tools PM’s

  • Monthly/bi-monthly/and annual dam inspections and reporting

  • DOE discharge monitoring tests

  • Monthly distribution system flushing

  • Water samples submitted for DOH monthly quality compliance

  • Cleaned and serviced online analyzers

  • Weekly customer leakage survey

  • Tested the WTP generator

Upcoming Projects:

➢ Replace sampling stations on Cedar Ave, and at the Island/Beach intersection
➢ Replace bent standpipe on Island Dr
➢ PRV vault replacement
➢ Install fish cages in the lakes
➢ Install Marina cameras
➢ Replace old standpipe valves
➢ Reservoir floating dock

June 2026 Water Production and Usage (in gallons)

Total Water Produced 395,300 Chlorine monitoring (0.178 gpm) 7,690
Flushing 3,000
Metered Usage 288,230
Other (Chlorine residual testing, BW) 2,250 Authorized Consumption 301,170
System Leakage 94,130
Percentage of loss 23.81% Average gallon per minute loss 2.18