June 20-July 23, 2026 Operations Report
/Nick Kluge, Operations Manager
During this period:
Dam O&M and EAP revisions
Connected fish cleaning station to water
Replaced marina hose
DOH Sanitary Survey
CCR and WUE delivered
Reviewed new residence construction plan
Replaced monitoring sensors
Replaced starter on LISECC Truck
Backhoe PM’s
Gutters and downspouts cleared
Filter maintenance
Holiday Lake grounds keeping
Drainage ditches cleared
CUPPS asset inventory
Mowing and grounds maintenance
Storm drains inspected and cleared of debris
Grounds keeping tools PM’s
Monthly/bi-monthly/and annual dam inspections and reporting
DOE discharge monitoring tests
Monthly distribution system flushing
Water samples submitted for DOH monthly quality compliance
Cleaned and serviced online analyzers
Weekly customer leakage survey
Tested the WTP generator
Upcoming Projects:
➢ Replace sampling stations on Cedar Ave, and at the Island/Beach intersection
➢ Replace bent standpipe on Island Dr
➢ PRV vault replacement
➢ Install fish cages in the lakes
➢ Install Marina cameras
➢ Replace old standpipe valves
➢ Reservoir floating dock
June 2026 Water Production and Usage (in gallons)
Total Water Produced 395,300 Chlorine monitoring (0.178 gpm) 7,690
Flushing 3,000
Metered Usage 288,230
Other (Chlorine residual testing, BW) 2,250 Authorized Consumption 301,170
System Leakage 94,130
Percentage of loss 23.81% Average gallon per minute loss 2.18