July 27-August 17, 2026 Operations Report
/Nick Kluge, Operations Manager
During this period:
CUPPS asset inventory
Pond weed removal
Filter performance trouble-shooting
Filter maintenance and inspection
Marina dock minor repairs (cleat and rub rail)
Groundskeeping powertool PM’s
LISECC work truck minor repairs (drivers side door check)
Replaced meter head at LISECC Cabana
DoF&W Wildlife Monitoring Equipment installed
Multiple customer leaks identified and customers informed
All gutters and downspouts cleared
Holiday Lake grounds keeping
Stormdrains inspected and cleared of debris
Mowing and grounds maintenance on all roads
Monthly/bi-monthly/and annual dam inspections and reporting
Supply run to town (treatment chemicals)
DOE discharge monitoring tests
Monthly distribution system flushing
Water samples submitted for DOH monthly quality compliance
Cleaned and serviced online analyzers
Weekly customer leakage survey
Tested the WTP generator
Upcoming Projects:
➢ Replace sampling stations on Cedar Ave, and at the Island/Beach intersection
➢ Replace bent standpipe on Island Dr
➢ PRV vault replacement
➢ Install fish cages in the lakes
➢ Install Marina cameras
➢ Replace old standpipe valves
➢ Reservoir floating dock
July 2026 Water Production and Usage (in gallons)
Total Water Produced 445,100 Chlorine monitoring (0.178 gpm) 7,946
Flushing 3,300
Metered Usage 334,670
Other (Chlorine residual testing, BW) 2,325 Authorized Consumption 348,241
System Leakage 96,859
Percentage of loss 21.8% Average gallon per minute loss 2.17