July 27-August 17, 2026 Operations Report

Nick Kluge, Operations Manager

During this period:

  • CUPPS asset inventory

  • Pond weed removal

  • Filter performance trouble-shooting

  • Filter maintenance and inspection

  • Marina dock minor repairs (cleat and rub rail)

  • Groundskeeping powertool PM’s

  • LISECC work truck minor repairs (drivers side door check)

  • Replaced meter head at LISECC Cabana

  • DoF&W Wildlife Monitoring Equipment installed

  • Multiple customer leaks identified and customers informed

  • All gutters and downspouts cleared

  • Holiday Lake grounds keeping

  • Stormdrains inspected and cleared of debris

  • Mowing and grounds maintenance on all roads

  • Monthly/bi-monthly/and annual dam inspections and reporting

  • Supply run to town (treatment chemicals)

  • DOE discharge monitoring tests

  • Monthly distribution system flushing

  • Water samples submitted for DOH monthly quality compliance

  • Cleaned and serviced online analyzers

  • Weekly customer leakage survey

  • Tested the WTP generator

Upcoming Projects:

➢ Replace sampling stations on Cedar Ave, and at the Island/Beach intersection
➢ Replace bent standpipe on Island Dr
➢ PRV vault replacement
➢ Install fish cages in the lakes
➢ Install Marina cameras
➢ Replace old standpipe valves
➢ Reservoir floating dock

July 2026 Water Production and Usage (in gallons)

Total Water Produced 445,100 Chlorine monitoring (0.178 gpm) 7,946
Flushing 3,300
Metered Usage 334,670
Other (Chlorine residual testing, BW) 2,325 Authorized Consumption 348,241
System Leakage 96,859
Percentage of loss 21.8% Average gallon per minute loss 2.17