August 18-September 17, 2026 Operations Report

Nick Kluge, Operations Manager

During this period:

  • Public notices drafting

  • Flushing A-Boards

  • LISECC Truck maintenance and diagnostics (thermostat housing leak)

  • Replaced smoke/CO detector at Club House

  • Junk removal from common areas

  • Pothole filled on Mt. Vista

  • Treatment plant troubleshooting and optimization

  • Marina dock inspections and minor maintenance

  • Water service connection for new construction installed

  • Multiple customer leaks identified and customers informed

  • All gutters and downspouts cleared

  • Grounds keeping all common areas

  • Stormdrains inspected and cleared of debris

  • Mowing and grounds maintenance on all roads

  • Monthly/bi-monthly/and annual dam inspections and reporting

  • Supply run to town (treatment chemicals and supplies)

  • DOE discharge monitoring tests

  • Monthly distribution system flushing

  • Water samples submitted for DOH monthly quality compliance

  • Cleaned and serviced online analyzers

  • Weekly customer leakage survey

  • Tested the WTP generator

Upcoming Projects:

➢ Marina docks to be removed September 29th
➢ Reduce distribution losses
➢ Replace sampling stations on Cedar Ave, and at the Island/Beach intersection
➢ Replace standpipes (Baker, Island, Marina)
➢ Replace all PRV’s
➢ Install fish cages in the lakes
➢ Install Marina cameras
➢ Replace old distribution valves
➢ Install reservoir floating dock
➢ Replace old WTP valves and components

August 2026 Water Production and Usage (in gallons)

Total Water Produced 550,100 Chlorine monitoring (0.178 gpm) 7,946
Flushing 3,100
Metered Usage 402,730
Other (Chlorine residual testing, BW) 2,325 Authorized Consumption 416,101
System Leakage 133,999
Percentage of loss 24.4% Average gallon per minute loss 3.0