August 18-September 17, 2026 Operations Report
/Nick Kluge, Operations Manager
During this period:
Public notices drafting
Flushing A-Boards
LISECC Truck maintenance and diagnostics (thermostat housing leak)
Replaced smoke/CO detector at Club House
Junk removal from common areas
Pothole filled on Mt. Vista
Treatment plant troubleshooting and optimization
Marina dock inspections and minor maintenance
Water service connection for new construction installed
Multiple customer leaks identified and customers informed
All gutters and downspouts cleared
Grounds keeping all common areas
Stormdrains inspected and cleared of debris
Mowing and grounds maintenance on all roads
Monthly/bi-monthly/and annual dam inspections and reporting
Supply run to town (treatment chemicals and supplies)
DOE discharge monitoring tests
Monthly distribution system flushing
Water samples submitted for DOH monthly quality compliance
Cleaned and serviced online analyzers
Weekly customer leakage survey
Tested the WTP generator
Upcoming Projects:
➢ Marina docks to be removed September 29th
➢ Reduce distribution losses
➢ Replace sampling stations on Cedar Ave, and at the Island/Beach intersection
➢ Replace standpipes (Baker, Island, Marina)
➢ Replace all PRV’s
➢ Install fish cages in the lakes
➢ Install Marina cameras
➢ Replace old distribution valves
➢ Install reservoir floating dock
➢ Replace old WTP valves and components
August 2026 Water Production and Usage (in gallons)
Total Water Produced 550,100 Chlorine monitoring (0.178 gpm) 7,946
Flushing 3,100
Metered Usage 402,730
Other (Chlorine residual testing, BW) 2,325 Authorized Consumption 416,101
System Leakage 133,999
Percentage of loss 24.4% Average gallon per minute loss 3.0